Test Online Free BICSI RCDDv14 Exam Questions and Answers

The questions for RCDDv14 were last updated On Aug.12 2022

Get RCDDv14 Full Access
 / 4

Question No : 1
When estimating an ICT distribution designer project timeline schedule based on the scope of work which two scheduling methods use network diagrams lo integrate logical activities and identify critical paths on the project? (Select two options.)

Answer:

Question No : 2
In the last year, all program phase gate reviews received excellent feedback and exceeded stakeholder expectations recently, the customer decides that there is no need to continue phase gate reviews.
What should the program manager do next?

Answer:

Question No : 3
The size and number of conduits or sleeves used for backbone pathways depend on the usable floor space served by the backbone distribution system.
What is the MINIMUM trade size of sleeves recommended to serve a TR, ER, or EF?

Answer:

Question No : 4
During the design phase, drawings for ICT communications spaces should be reviewed for Standards compliance and

Answer:

Question No : 5
A three-year program using vendor contracts, incorporating related projects, and each with specific stakeholders is coming to an end What should be completed first to close all appropriate contracts?

Answer:

Question No : 6
A program manager is identifying and verifying risks as outlined in the risk management plan. The results will be recorded in which of the following?

Answer:

Question No : 7
A company is building a global monitoring network in 40 countries. The program completes the planning phase and a review is conducted of the program components' strategic alignment with the intended program and company goals. The review identifies issues that should be resolved to improve program progress. One of the issues identified is the lack of incorporation of both software and configuration management tools
Which of the following must be addressed?

Answer:

Question No : 8
Which requirement does the ICT distribution designer provide to the Mechanical Engineer in charge of the HVAC design for a Telecommunication Space?

Answer:

Question No : 9
Which of the following is the process of limiting fire and smoke using fire-resistive barriers?

Answer:

Question No : 10
Exhibit:



A pay telephone using coins needs to be installed in a public area. In the specifications, it is required that the telephone shall meet the ADA (American with Disabilities Act) requirement for front reach using a wheelchair.
What will be the maximum reachable height or the value of "X"?

Answer:

 / 4
  TOP 50 Exam Questions
Exam